About me
Summary of QualificationsHarm Matthijs van der Worp is a person with a driven, energetic approach and a hands-on mentality, who is not afraid to take up a challenge. He offers an added value in a role where independence, the ability to improvise and broad-mindedness make the difference. He has extensive knowledge of and experience in water safety and water management projects as well as in starting, guiding and directing interdisciplinary projects. He knows by his flexible attitude and single-minded method how to get things done. He is capable of stimulating people by his enthusiasm and verbal skills. He is a reliable and helpful team player with an eye for the overall result. |
Professional Experience
Very broad 20 years of experience / expertise as a water engineer in various roles and businesses, from contractors, consultancy companies to public utilities and local governments (Water Boards1, Department of Waterways and Public Works2 and municipalities).
Extensively skilled in:
- Water Management, Stakeholder & Area Management, Project Management;
- Technical Management, Process Management, Tender Management;
- (Network) Planning, Project Scheduling and Programming;
- Acquisition, Client Management, Permitting.
Employment record
2013 – PresentWSM Consult B.V., UtrechtOwner & consultantConsultancy within the field of Project Management and Stakeholder & Area Management in water engineering projects, in The Netherlands and beyond. |
Projects:2013 - present - Contractor De Klerk Waterbouw B.V., WerkendamAssignments: Stakeholder & Area Management within the following hydraulic engineering projects: - Reconstruction of the port Boven-Hardinxveld commissioned by the municipality of Hardinxveld-Giessendam; - Replacement of the inhibition and guide works of Schipdiep flood gate commissioned by Water Board Brabantse Delta; - Realization nautical quay in Vlissingen The Netherlands commissioned by Zeeland Seaports; - Several hydraulic activities (including replacing sheet piles, inhibitions, floodbank protection, dredging) commissioned by and/or in the catchment area of Port of Amsterdam, Port of Rotterdam, Municipalities, Department of Waterways and Public Works in the Netherlands, several water boards, in both urban and port area and rural area; - Hydraulic activities on several lock complexes of the Department of Waterways and Public Works in the Netherlands; - Input in several tender projects. 2020 - Contractor Max Bögl, AmsterdamAssignment: Stakeholder & Area Management within project: The Entrance gateway to Amsterdam, 'The Entree'. 2019 - 2020, 10 months - Levvel (Contractors van Oord/BAM) – The Afsluitdijk (www.theafsluitdijk.com), Den OeverAssignment: Stakeholder & Area Management / work planning within team Renovation Sluices. 2018 - 2019, 1 year - Contractor Dura Vermeer, CruquiusAssignment: Stakeholder & Area Management within a reconstruction project of the expressway N231.
2017 - 2018, 10 months - Waterboard Rijnland, LeidenAssignment: Stakeholder & Area Management within regional water area plans. 2017 - Contractor Boskalis Nederland B.V., Rotterdam / De Klerk Waterbouw B.V., WerkendamAssignment: Stakeholder & Area Management within the project ‘Realisation Goessekade’.
2013/2017 - Contractor Gebr. Schep B.V., BenschopAssignments: Writing/reviewing plan of approach in the following tenders: - Project ‘Realisatie Recreatieve Routes Blokhove’ for municipality Houten (2017). - Project ‘Oevers Kromme Rijn te Bunnik’ for Water Board Hoogheemraadschap de Stichtse Rijnlanden (2013, won and executed).
2016, 3 months - Contractor de Jong Zuurmond, BeesdAssignment: Setting up Stakeholder & Area Management in a maintenance contract for roads commissioned by the Department of Waterways and Public Works in the Netherlands.
2014 - 2015, 1 year - Department of Waterways and Public Works (Rijkswaterstaat), UtrechtAssignment: Project Management / Project Preparation (Conditioning) within a DBFM (Design, Build, Finance & Maintenance) Lock Enhancement Programme (DBFM-programma Sluizen). Tasks: Responsible for project preparation (Eefde Lock, Princess Beatrix Lock) and involved in the input of the DBFM - contract. Contribution in the legal agreement between the Department of Waterways and Public Works and the local waterboard for the relocation of the levee.
2014, 6 months - Regional Board Gdańsk (Lower Vistula Water Region), PolandAssignment: Participation in Action Plan for Stage II (2014-2020), Program Comprehensive flood protection of Zulawy Lowlands until year 2030.
2013, 2 months - Artelia Nederland B.V., Capelle a/d IJsselAssignment: Stakeholder & Area Management / Tender Management within a tender team for a demolition project (based on Best Value Procurement method). Responsible for stakeholder management, risk management and overall consultancy to supply a competitive offer. |
2012 – 2013Van der Worp Infraconsult B.V., MaarssenСo-owner & consultant (Water Management) |
Projects:2013, 2 months - Contractor Mourik, Groot-AmmersAssignment: Tender Management within a tender team for a levee enhancement project in the Netherlands. Responsible for risk management, the translation of the contract document (basic contract, technical specifications, stakeholder specifications by the systematics of Systems Engineering) and overall consultancy within the team to supply a competitive offer.
2012, 1 year - Water Board Hoogheemraadschap Hollands Noorderkwartier, HeerhugowaardAssignment: Stakeholder & Area Management / Technical Management Tasks: Responsible for both stakeholder and technical knowledge and input for the project team (specifications by the systematics of Systems Engineering) within several levee enhancement projects (using the systematics by a derivative of the Prince2 methodology for a design & construct contract). |
2008 – 2011HMvanderWorp Advies, UtrechtOwner & consultant Water Management |
Projects:2010, 2 months - Municipality Renkum, OosterbeekAssignment: To set up a plan for water storage on private properties.
2010 - 2011, 1,5 year - Water Board Hoogheemraadschap De Stichtse Rijnlanden, HoutenAssignment: Levee Management Tasks: Responsible for management proposals, including the technical input. Responsible for project contracts and project plans for the management, maintenance and enhancement of levees. Responsible for support and technical input of levees for both external research and interdisciplinary stakeholder projects. The review of test results of levees. Stakeholder & Area Management.
2009, 5 months - Water Board Waterschap Rijn & IJssel, DoetinchemAssignment: Account Management Tasks: Responsible for the reporting, consulting and reviewing of construction plans and construction projects that relate to the tasks and responsibilities of the Water Board; Stakeholder & Area Management.
2009, 5 months - Water Board Waternet, AmsterdamAssignment: Levee Management Tasks: Reviewing test results of levees. Supporting the process of contract for testing regional levees. Setting up project plans and an internal guide for the transfer of project files within the project.
2008 - 2009, 2 years - Sweco Nederland bv, De BiltAssignment: Consultancy Geotechnics Tasks: Testing levees. Contract and Stakeholder & Area Management, coordination and planning of soil research. |
2004 – 2007RPS, LeerdamConsultant / Project Manager water |
Projects:Working in several projects with different tasks within the field of water management, water safety, water law and regulation, including: For different Water Boards in the Netherlands performing research in flooding of several water systems, setting up plans of water level decisions (peilbesluiten) and performing water system analysis. Consulting on water permits at Water Boards. Consulting on water policy at municipalities. |
2002 – 2003Movares, UtrechtConsultant GeohydrologySetting up water management plans inside project organization. |
1999NIWA, Christchurch, New ZealandInternship |
Business courses / Education / Workshops
2017 |
Introduction to Water Diplomacy (UNITAR) |
2015 |
SCC (Safety Certificate Contractors) |
2014 |
DBFM (e-learning & simulation game) |
2012 |
Systems Engineering (how2SE) |
2012 |
Implementation aspects of levee construction (PAO) |
2011 |
Project Management Prince2 (ICM/PAT) |
2011 |
Relation Management (KIVI NIRIA) |
2009 |
Networking Course (Roodbaard) |
2009 |
Process and Information analysis (HIT BV) |
2008 |
Entrepreneurship (several) |
2005 |
Permit Authorization (several) |
2003 |
Effective Reporting (Movares) |
1995 – 2002 |
Wageningen University, Wageningen. Hydrology and Water management (diploma) |
1994 – 1995 |
Technical University, Eindhoven. Chemical Technology |
1988 – 1994 |
Sint Bonifatius College, Utrecht. Gymnasium (pre-university education) |
Languages |
Computer skills |
||
Dutch | Native | Microsoft Office, ArcGis, Mac OS X | |
English | Fluent | ||
German | Good | ||
Spanish | Average | ||
French | Average | ||
Russian | Basic |